1.
Wall is framed, and sheet-rocked and readied for finishing. |

2.
Styrofoam inserts form radiused corners that are placed and glued
into final position. |

3.
Styrofoam is covered with joint compound and prepared for painting. |

4.
Final coat of paint and tomorrow we can assemble our project. |

5.
The first piece is set, shimmed and the sill plate leveled before
adhering in place. |
|

6.
Glue and stainless steel screws hold the sill level and in place. |

7.
Side wall pieces are checked for placement and fit. |

8.
Side pieces are glued in place with special foam adhesive. |

9.
Front profiled straights and rediused pieces are glued and placed. |

10.
Inside radiused pieces are positioned and glued in place. |
|

11.
All pieces are in place and the pass-through is ready for
grouting and sealing if desired. |

12.
Quoins are added to the wall to tie the elements together. Outside
face tiles are added first. |

13.
Next the quoins are positioned and glued. |

14.
Opening is grouted and the quoins are added. |

15.
Complete assembly took only three hours. |
|